# Added deliverable: specification for iterating the original prototype Chris requests an additional deliverable from the existing Claude integrated-planning session: a self-contained design/prototype specification suitable to hand to the Claude design session that created the initial prototype referenced in the plans. The specification must incorporate all final owner decisions and amendments from the 4–5 October session and explain the intended interaction behavior in enough detail to iterate the prototype without reconstructing this conversation. Identify and link the original prototype from the existing planning sources; do not invent a new prototype or assume a design-session identity. Include: - Product goals, domain terminology, roles and permission/blinding boundaries. - Screen/workspace inventory, navigation and the approved step selector/one-form area. - Concrete flows and states for screening, annotation, reconciliation, merge/unmerge, active work, publication, migration, reviewer-pool browsing, catalogue, training, notifications and project deletion/restoration. - Loading, empty, pending, incomplete, completed, unavailable, historical, conflict and failure states; exact distinctions between autosaved draft, checkpoint and completion. - Configuration ownership and defaults, permitted overrides, impact previews and confirmations, with examples. - Reconciled hints/click-to-fill, identity-protecting candidate presentation and permission-aware provenance. - Full phone/tablet/desktop annotation and large-form/accessibility requirements. - Baseline/MVP scope, opt-in beta and deferred enhancements, including non-MVP PWA exploration and deferred answer-based step branching. - Traceability to decisions/specification sections, prototype changes needed, acceptance scenarios and explicitly unresolved design inputs. Provide a copy-ready design-session handoff prompt referencing the specification and source prototype. This request is to generate the handoff, not to message or operate the design session. Feature implementation remains on hold. Update the integrated deliverable list, dossier/status and future-work tracker accordingly.